Transmission & Grid

Substations and high-voltage lines up to 500 kV that connect new generation to demand.

Power transformers and switchgear at a high-voltage substation
410 km
Lines in operation and construction
12
Substations
500 kV
Highest voltage level

New generation is only useful if it can reach demand. We build the substations and high-voltage lines our own projects need, and we develop transmission assets for third parties under regulated or contracted schemes.

In southern Peru, where mines and solar plants sit far from the main grid, transmission is often the part of a project that takes longest. We plan routes, easements and permits in parallel with the generation project so both reach operation together.

What we cover

  • Step-up and switching substations up to 500 kV
  • High-voltage lines from 138 to 500 kV
  • Connection studies and coordination with grid operators
  • Routes, easements and right-of-way management