Southern Andes 220 kV Link
- Technology
- Transmission
- Capacity
- 142 km
- Grid connection
- 220 kV
- Expected operation
- 2027
Single-circuit line and two substations to connect new solar capacity and mining demand in southern Peru.
Substations and high-voltage lines up to 500 kV that connect new generation to demand.

New generation is only useful if it can reach demand. We build the substations and high-voltage lines our own projects need, and we develop transmission assets for third parties under regulated or contracted schemes.
In southern Peru, where mines and solar plants sit far from the main grid, transmission is often the part of a project that takes longest. We plan routes, easements and permits in parallel with the generation project so both reach operation together.
Single-circuit line and two substations to connect new solar capacity and mining demand in southern Peru.